A geyser installation is more than a tank on a bracket. The valves, drip tray and overflow pipes protect your house and your insurance cover. If you need geyser installation in Pretoria East or Centurion, book a plumber and ask for everything on the list below.

What a compliant installation includes

SANS 10254 is the South African standard for fixed electric storage geysers. Kwikot, the geyser manufacturer, lists these requirements for a compliant installation:

  • A drip tray. The geyser sits in a tray that catches leaks. The tray has an overflow pipe running to the outside of the building.
  • A safety valve. Also called the temperature and pressure relief valve. It releases water if the temperature or pressure becomes unsafe. Its discharge must also be piped to the outside.
  • Vacuum breakers. One on the hot line and one on the cold line, to stop water siphoning back out of the tank and to stop the tank collapsing under vacuum.
  • An isolation valve. It lets you shut off the geyser without cutting water to the whole house.
  • A pressure control valve. It reduces the incoming pressure to what the geyser is rated for and relieves the expansion as the water heats.

Kwikot also states that geysers should be installed to SANS 10254 by a qualified plumber.

The usual shortcuts are a new geyser connected to the old valves, and an overflow pipe that ends inside the roof space. Ask to be shown the valves and where each overflow pipe ends before the plumber leaves.

Why the extras matter

Valves cost less than ceilings.

A tank that leaks into a roof space with no drip tray soaks the ceiling before anyone notices. A drip tray with a pipe to the outside gives you a visible drip on an outside wall instead of a collapsed ceiling.

The safety valve is the last line of defence if a thermostat fails and the element keeps heating. Without it the pressure has nowhere to go. The pressure control valve has to match the geyser too: geysers are built for a rated working pressure, commonly 400 kPa or 600 kPa, and a valve that passes more than that overstresses the tank.

Insurance is the other reason. Kwikot says insurers check whether a valid certificate of compliance exists, and a non-compliant installation can lead to a rejected claim. Read your own policy wording, because each insurer sets its own requirements. Our guide to the plumbing certificate of compliance explains what the certificate covers.

Certificate of compliance: how it works

A plumbing certificate of compliance is a record that an installation meets the standard. It is issued by plumbers licensed with PIRB, the Plumbing Industry Registration Board, which names geysers, solar water heating and heat pumps among the work its licensed plumbers certify.

Whether you need one depends on your insurer and your municipality, so read your policy wording and ask your insurer what it wants to see. Our plumbing certificate of compliance guide explains what the certificate covers and who can issue it.

Choosing a geyser

Start with what you are replacing. The same size in the same position is usually the simplest job. Changing the size, moving the geyser, or switching to solar, a heat pump or gas all change the work.

Questions to settle with your plumber:

  1. What size do we need for the people in this house?
  2. What is the geyser's pressure rating, and what is the supply pressure?
  3. Where does each overflow pipe run?
  4. Is the existing pipework in good enough condition to reconnect?
  5. Which old valves are being reused, and why?

Old valves should not go onto a new geyser without a good reason. They are cheap against the cost of the tank.

What geyser installation in Pretoria East costs

The cost has three parts: the geyser, the valves and fittings, and labour. This page gives no flat price for the geyser itself, because that depends on the unit you choose.

CopperTap's rates, all excluding materials:

Item Standard hours (Mon-Fri 07:00-17:00) After hours, weekends, public holidays
Call-out (travel and diagnosis) R450 R850
Labour R550 per hour R850 per hour

Labour is billed per 30 minutes. For what installations typically cost across South Africa, see geyser installation cost and geyser replacement cost. A planned replacement belongs in standard hours, which costs far less than an after-hours replacement once the old geyser has failed.

What to expect on the day

How long a replacement takes depends on access and the condition of the old pipework, so ask for an estimate. The sequence is: isolate water and power, drain the old geyser, remove it, set up the drip tray and overflow, fit the valves, reconnect the pipes, fill the tank, and test for leaks before the power goes back on.

A geyser must not be switched on until it is full. An element that heats in an empty tank burns out. Ask the plumber to confirm that the tank is full and the air is out of the lines before the breaker at the DB board is switched on.

Replace before it fails

A geyser that bursts at night costs more than a planned replacement in daylight: after-hours rates plus water damage. If your geyser is old, rusting, weeping at the connections or has needed repeated repairs, plan the replacement.

Warning signs on the unit:

  • Rust streaks or staining on the casing
  • Water marks on the ceiling below
  • Water from the overflow pipe that does not stop
  • Hot water that runs out faster than it used to

If it has already failed, see burst geyser. If it is still working but faulty, see geyser repairs.

Book a plumber

Give your suburb, the geyser's size and position, and send a photo of the existing geyser and valves if you can. You can book a plumber or email info@coppertap.co.za.

Frequently asked questions

What is SANS 10254?

SANS 10254 is the South African standard for the installation, maintenance, replacement and repair of fixed electric storage water heaters (geysers). It covers how the geyser must be installed, including the drip tray, valves and overflow pipes. Manufacturers and insurers expect installations to follow it.

What must be installed with a new geyser?

Kwikot lists a drip tray with an overflow pipe to the outside, a safety (temperature and pressure relief) valve piped to the outside, vacuum breakers on the hot and cold lines, an isolation valve and a pressure control valve. A plumber confirms what your particular installation needs.

Do I need a certificate of compliance for a geyser?

Requirements differ. A plumbing certificate of compliance is a record, issued by a plumber licensed with PIRB, that an installation meets the standard. Insurers and some local authorities may ask for one for a geyser, so check your policy wording and ask your insurer what it needs. Our certificate guide explains how it works.

How much does geyser installation cost?

It depends on the geyser size, the valves needed and the condition of the existing pipework. CopperTap's labour is R550 per hour in standard hours, plus a R450 call-out, excluding materials. The geyser and valves are the larger cost. Ask for the full materials list in writing.

Can I install a geyser myself?

It is not advisable. A geyser involves pressurised hot water, mains electricity and valves that protect the tank against over-pressure and collapse. Kwikot says installations should be done by a qualified plumber to SANS 10254. A poor installation can affect the manufacturer's cover and your insurance.